project
GONE Hemmingstätterweg
Parallel charging of cars during working hours
Flexible expansion from 12 to 30 charging stations possible
ChargeX's innovative technology made it possible to use the existing power connection to charge multiple electric cars. As a result, costly measures, such as installing a second house connection or building a transformer house, could be avoided. In addition, aspects of fire protection and liability risks for insurance claims played an important role in the planning phase.